NOTICE TO AIRPORT ENGINEERING CONSULTANTSThe City of Malden, Missouri ("Sponsor"), is hereby solicitingstatements of qualifications and experience from qualifiedconsultants for airfield development projects at MaldenRegional Airport. Projects may be subject to future receipt ofFederal funding under the Federal Aviation Administration (FAA)Airport Improvement Program, as administered by the MissouriDepartment of Transportation (MoDOT) through the StateBlock Grant Program (SBGP). These projects may include thefollowing:projects are complete. Projects other than those listed abovewill require a new solicitation except as allowed in FAA AdvisoryCircular 150/5100-14 paragraph 2.7.2 (4). Disclosure: Under aprevious agreement, Crawford, Murphy & Tilly (CMT) assistedthe Sponsor with preparation of their CIP and the above costestimatesThis contract is subject to all applicable Federal Provisions,which include, but are not limited to:Title VI of the Civil Rights Act of 1964Section 520 of the Airport and Airway Improvement Act of1982DOT Regulation 49 CFR Part 20-Lobbying andInfluencing Federal EmployeesDOT Regulation 49 CFR Part 26-Disadvantaged BusinessEnterprises ParticipationDOT Requlation 49 CFR Part 30-Foreign Trade RestrictionClauseDOT Regulation 2 CFR Part 180 and 1200-GovernmentDebarment and SuspensionDOT Regulation 2 CFR 200 Appendix II, including Accessto Records and Reports, Breach of Contract Terms, Rightsto Inventions, and Termination of ContractA qualification based selection process conforming to FAAAdvisory Circular 150/5100-14 will be utilized to select the mostqualified firm. Selection criteria will include, but may not belimited to:1Design and Construct conventional hanger. Estimatedcost $535,000.Design and Consturct RWY 18/36 reconstruction.Recent experience in airport projectsCapability to perform all aspects of projectAbility to meet schedules within budgetKnowledge of FAAMoDOT design and construction2Estimated cost $2,450,000.Install RWY 18/36 REIL's. Estimated cost $79,000.3RWY 18/36 Edge lights & replace PAPIS. Estimated cost$756.0005.4standardsKnowledge of FAA/MoDOT regulations, policies andprocedures.Quality of previous airport projects undertakenPersonnel experience and qualificationsAn implemented Affirmative Action ProgramDesign and Construct RWY 14/32 rehabiltation.Estimated cost $1,200,000.Airport consultants should submit three copies of theirstatement of qualifications and experience along with referencesto the following address, no later than 4:00 PM July 19. 2019.The consultant should also provide an affidavit of compliancewith the federal work authorization program and a copy ofthe firm's E-Verify Memorandum of Understanding. Questionsregarding this solicitation can be directed to David Blalock at573-276-2279Apron Perimeter Fencing. Estimated cost $165,000.6RWY 18/36 extension & sonctruct taxiway. Estimated7cost $3,150,000.The required services include, but are not limited to, engineeringservices for preliminary, design, bidding, and constructionphases and incidental special services including geotechnical,preparing categorical exclusion documentation, as-built ALPupdates, and surveying. The consultant should provide thename(s) of preferred firm(s) for any work which is likely to-be sub-consulted. Sub-consultant changes can occur withSponsor approval. At the Sponsor's discretion, this selectioncan be retained for projects initiated within five years or until allFees will be negotiated for projects as federal funds becomeavailable. Consultants shall not include fee or costinformation when responding to this solicitation. Prospectiveconsultants are advised that applied overhead rates must be inaccordance with the cost principles established within FederalRegulation 48 CFR Part 31, Contract Cost Principles andProcedures. After selection, the successful firm will be requiredto submit a copy of their current overhead rate audit certificationor MoDOT pre-approval.SUBMIT DOCUMENTS TO:David Blalock, Airport ManagerMalden Regional Airport/City of MaldenPO Box 411Malden, MO 63863 NOTICE TO AIRPORT ENGINEERING CONSULTANTS The City of Malden, Missouri ("Sponsor"), is hereby soliciting statements of qualifications and experience from qualified consultants for airfield development projects at Malden Regional Airport. Projects may be subject to future receipt of Federal funding under the Federal Aviation Administration (FAA) Airport Improvement Program, as administered by the Missouri Department of Transportation (MoDOT) through the State Block Grant Program (SBGP). These projects may include the following: projects are complete. Projects other than those listed above will require a new solicitation except as allowed in FAA Advisory Circular 150/5100-14 paragraph 2.7.2 (4). Disclosure: Under a previous agreement, Crawford, Murphy & Tilly (CMT) assisted the Sponsor with preparation of their CIP and the above cost estimates This contract is subject to all applicable Federal Provisions, which include, but are not limited to: Title VI of the Civil Rights Act of 1964 Section 520 of the Airport and Airway Improvement Act of 1982 DOT Regulation 49 CFR Part 20-Lobbying and Influencing Federal Employees DOT Regulation 49 CFR Part 26-Disadvantaged Business Enterprises Participation DOT Requlation 49 CFR Part 30-Foreign Trade Restriction Clause DOT Regulation 2 CFR Part 180 and 1200-Government Debarment and Suspension DOT Regulation 2 CFR 200 Appendix II, including Access to Records and Reports, Breach of Contract Terms, Rights to Inventions, and Termination of Contract A qualification based selection process conforming to FAA Advisory Circular 150/5100-14 will be utilized to select the most qualified firm. Selection criteria will include, but may not be limited to: 1 Design and Construct conventional hanger. Estimated cost $535,000. Design and Consturct RWY 18/36 reconstruction. Recent experience in airport projects Capability to perform all aspects of project Ability to meet schedules within budget Knowledge of FAAMoDOT design and construction 2 Estimated cost $2,450,000. Install RWY 18/36 REIL's. Estimated cost $79,000. 3 RWY 18/36 Edge lights & replace PAPIS. Estimated cost $756.000 5. 4 standards Knowledge of FAA/MoDOT regulations, policies and procedures .Quality of previous airport projects undertaken Personnel experience and qualifications An implemented Affirmative Action Program Design and Construct RWY 14/32 rehabiltation. Estimated cost $1,200,000. Airport consultants should submit three copies of their statement of qualifications and experience along with references to the following address, no later than 4:00 PM July 19. 2019. The consultant should also provide an affidavit of compliance with the federal work authorization program and a copy of the firm's E-Verify Memorandum of Understanding. Questions regarding this solicitation can be directed to David Blalock at 573-276-2279 Apron Perimeter Fencing. Estimated cost $165,000. 6 RWY 18/36 extension & sonctruct taxiway. Estimated 7 cost $3,150,000. The required services include, but are not limited to, engineering services for preliminary, design, bidding, and construction phases and incidental special services including geotechnical, preparing categorical exclusion documentation, as-built ALP updates, and surveying. The consultant should provide the name(s) of preferred firm(s) for any work which is likely to- be sub-consulted. Sub-consultant changes can occur with Sponsor approval. At the Sponsor's discretion, this selection can be retained for projects initiated within five years or until all Fees will be negotiated for projects as federal funds become available. Consultants shall not include fee or cost information when responding to this solicitation. Prospective consultants are advised that applied overhead rates must be in accordance with the cost principles established within Federal Regulation 48 CFR Part 31, Contract Cost Principles and Procedures. After selection, the successful firm will be required to submit a copy of their current overhead rate audit certification or MoDOT pre-approval. SUBMIT DOCUMENTS TO: David Blalock, Airport Manager Malden Regional Airport/City of Malden PO Box 411 Malden, MO 63863

Date: June 8, 2019

Active Ad

This ad expires on
July 8, 2019 (20 days)
more_vert

The City of Malden

Public Services / Government Associations

Call
Call (573) 276-4502
Directions
Get directions to this
location on Google Maps.
Website
Open website
in new tab.

Text

NOTICE TO AIRPORT ENGINEERING CONSULTANTS The City of Malden, Missouri ("Sponsor"), is hereby soliciting statements of qualifications and experience from qualified consultants for airfield development projects at Malden Regional Airport. Projects may be subject to future receipt of Federal funding under the Federal Aviation Administration (FAA) Airport Improvement Program, as administered by the Missouri Department of Transportation (MoDOT) through the State Block Grant Program (SBGP). These projects may include the following: projects are complete. Projects other than those listed above will require a new solicitation except as allowed in FAA Advisory Circular 150/5100-14 paragraph 2.7.2 (4). Disclosure: Under a previous agreement, Crawford, Murphy & Tilly (CMT) assisted the Sponsor with preparation of their CIP and the above cost estimates This contract is subject to all applicable Federal Provisions, which include, but are not limited to: Title VI of the Civil Rights Act of 1964 Section 520 of the Airport and Airway Improvement Act of 1982 DOT Regulation 49 CFR Part 20-Lobbying and Influencing Federal Employees DOT Regulation 49 CFR Part 26-Disadvantaged Business Enterprises Participation DOT Requlation 49 CFR Part 30-Foreign Trade Restriction Clause DOT Regulation 2 CFR Part 180 and 1200-Government Debarment and Suspension DOT Regulation 2 CFR 200 Appendix II, including Access to Records and Reports, Breach of Contract Terms, Rights to Inventions, and Termination of Contract A qualification based selection process conforming to FAA Advisory Circular 150/5100-14 will be utilized to select the most qualified firm. Selection criteria will include, but may not be limited to: 1 Design and Construct conventional hanger. Estimated cost $535,000. Design and Consturct RWY 18/36 reconstruction. Recent experience in airport projects Capability to perform all aspects of project Ability to meet schedules within budget Knowledge of FAAMoDOT design and construction 2 Estimated cost $2,450,000. Install RWY 18/36 REIL's. Estimated cost $79,000. 3 RWY 18/36 Edge lights & replace PAPIS. Estimated cost $756.000 5. 4 standards Knowledge of FAA/MoDOT regulations, policies and procedures .Quality of previous airport projects undertaken Personnel experience and qualifications An implemented Affirmative Action Program Design and Construct RWY 14/32 rehabiltation. Estimated cost $1,200,000. Airport consultants should submit three copies of their statement of qualifications and experience along with references to the following address, no later than 4:00 PM July 19. 2019. The consultant should also provide an affidavit of compliance with the federal work authorization program and a copy of the firm's E-Verify Memorandum of Understanding. Questions regarding this solicitation can be directed to David Blalock at 573-276-2279 Apron Perimeter Fencing. Estimated cost $165,000. 6 RWY 18/36 extension & sonctruct taxiway. Estimated 7 cost $3,150,000. The required services include, but are not limited to, engineering services for preliminary, design, bidding, and construction phases and incidental special services including geotechnical, preparing categorical exclusion documentation, as-built ALP updates, and surveying. The consultant should provide the name(s) of preferred firm(s) for any work which is likely to- be sub-consulted. Sub-consultant changes can occur with Sponsor approval. At the Sponsor's discretion, this selection can be retained for projects initiated within five years or until all Fees will be negotiated for projects as federal funds become available. Consultants shall not include fee or cost information when responding to this solicitation. Prospective consultants are advised that applied overhead rates must be in accordance with the cost principles established within Federal Regulation 48 CFR Part 31, Contract Cost Principles and Procedures. After selection, the successful firm will be required to submit a copy of their current overhead rate audit certification or MoDOT pre-approval. SUBMIT DOCUMENTS TO: David Blalock, Airport Manager Malden Regional Airport/City of Malden PO Box 411 Malden, MO 63863 NOTICE TO AIRPORT ENGINEERING CONSULTANTS The City of Malden, Missouri ("Sponsor"), is hereby soliciting statements of qualifications and experience from qualified consultants for airfield development projects at Malden Regional Airport. Projects may be subject to future receipt of Federal funding under the Federal Aviation Administration (FAA) Airport Improvement Program, as administered by the Missouri Department of Transportation (MoDOT) through the State Block Grant Program (SBGP). These projects may include the following: projects are complete. Projects other than those listed above will require a new solicitation except as allowed in FAA Advisory Circular 150/5100-14 paragraph 2.7.2 (4). Disclosure: Under a previous agreement, Crawford, Murphy & Tilly (CMT) assisted the Sponsor with preparation of their CIP and the above cost estimates This contract is subject to all applicable Federal Provisions, which include, but are not limited to: Title VI of the Civil Rights Act of 1964 Section 520 of the Airport and Airway Improvement Act of 1982 DOT Regulation 49 CFR Part 20-Lobbying and Influencing Federal Employees DOT Regulation 49 CFR Part 26-Disadvantaged Business Enterprises Participation DOT Requlation 49 CFR Part 30-Foreign Trade Restriction Clause DOT Regulation 2 CFR Part 180 and 1200-Government Debarment and Suspension DOT Regulation 2 CFR 200 Appendix II, including Access to Records and Reports, Breach of Contract Terms, Rights to Inventions, and Termination of Contract A qualification based selection process conforming to FAA Advisory Circular 150/5100-14 will be utilized to select the most qualified firm. Selection criteria will include, but may not be limited to: 1 Design and Construct conventional hanger. Estimated cost $535,000. Design and Consturct RWY 18/36 reconstruction. Recent experience in airport projects Capability to perform all aspects of project Ability to meet schedules within budget Knowledge of FAAMoDOT design and construction 2 Estimated cost $2,450,000. Install RWY 18/36 REIL's. Estimated cost $79,000. 3 RWY 18/36 Edge lights & replace PAPIS. Estimated cost $756.000 5. 4 standards Knowledge of FAA/MoDOT regulations, policies and procedures .Quality of previous airport projects undertaken Personnel experience and qualifications An implemented Affirmative Action Program Design and Construct RWY 14/32 rehabiltation. Estimated cost $1,200,000. Airport consultants should submit three copies of their statement of qualifications and experience along with references to the following address, no later than 4:00 PM July 19. 2019. The consultant should also provide an affidavit of compliance with the federal work authorization program and a copy of the firm's E-Verify Memorandum of Understanding. Questions regarding this solicitation can be directed to David Blalock at 573-276-2279 Apron Perimeter Fencing. Estimated cost $165,000. 6 RWY 18/36 extension & sonctruct taxiway. Estimated 7 cost $3,150,000. The required services include, but are not limited to, engineering services for preliminary, design, bidding, and construction phases and incidental special services including geotechnical, preparing categorical exclusion documentation, as-built ALP updates, and surveying. The consultant should provide the name(s) of preferred firm(s) for any work which is likely to- be sub-consulted. Sub-consultant changes can occur with Sponsor approval. At the Sponsor's discretion, this selection can be retained for projects initiated within five years or until all Fees will be negotiated for projects as federal funds become available. Consultants shall not include fee or cost information when responding to this solicitation. Prospective consultants are advised that applied overhead rates must be in accordance with the cost principles established within Federal Regulation 48 CFR Part 31, Contract Cost Principles and Procedures. After selection, the successful firm will be required to submit a copy of their current overhead rate audit certification or MoDOT pre-approval. SUBMIT DOCUMENTS TO: David Blalock, Airport Manager Malden Regional Airport/City of Malden PO Box 411 Malden, MO 63863

Other Ads

codeEmbed

Ads Widget

close

Widget URL

Embed Code

Embed these ads anywhere HTML code is accepted by pasting the snippet below.